Try “tree removal cost”, “R-value”, or “mowing per acre”.

How to Convert a Tub to a Walk-In Shower: Demo, Drain, Valve, Kit

Updated · See the full walk-in shower cost comparison

Converting a tub to an acrylic shower yourself: $2,490–$3,040 in kit, valve, glass and permit, 24–40 hours.

  • This guide is the acrylic conversion. The plumbing — a centered 2 in drain and a new anti-scald valve — is the real work; the kit is instructions and patience.
  • Pull the plumbing permit and have the rough-in inspected before the base goes in. It's cheap, and the inspector is a free second set of eyes on the two things that leak.
  • Set the base in a bed of mortar, level in both directions, with the drain sealed to the manufacturer's spec. A base that rocks cracks; a drain that isn't sealed is the leak you find from downstairs.
  • For a tile shower, the same demo and plumbing apply, then one waterproofing system, followed exactly, flood-tested for 24 hours before any tile.

Before you start

Read the cost comparison first if the method isn’t settled. The short version: an acrylic tub-to-shower conversion saves about $2,235 and is a fair DIY job for someone who can do basic plumbing; a tile shower saves more and is a waterproofing job first; curbless is for a contractor. This guide is the acrylic conversion, with a section on the tile pan at the end.

Two conditions before you commit: the drain is reachable — from a basement or crawl space, or through the floor with a finished ceiling you’re willing to patch — and there’s a second bathroom for the three weekends this takes.

What you need

A base and three-wall kit sized to the alcove, a matched rough-in pressure-balance valve and trim, the 2 in drain assembly for that base, a framed or semi-frameless door, PVC and fittings for the drain and trap, PEX or copper for the supplies, mortar for the base bed, panel adhesive, 100% silicone, cement board or moisture-resistant drywall for the exposed edges, and plywood for subfloor repair. Tools: a reciprocating saw rental for the tub, an oscillating multi-tool, a hole saw, a tubing cutter and push-fit fittings, a drill, a 4 ft level, a respirator and gloves. The priced list is on the cost page.

The two things that decide how it turns out

The drain seal and the base bed. Nearly every leak in a prefab shower is at the drain — a gasket seated wrong, a base that rocks on an unsupported floor and works the seal loose. Mortar bed, level, the manufacturer’s tightening sequence, and a ten-minute test from below.

The valve. It’s code, it’s in the wall forever, and it’s the one part you don’t want to open the panels to reach. Matched rough-in and trim, set at the right depth for the finished wall, tested before the walls close, inspected.

If you’re tiling instead

The demolition and plumbing are the same. Then the floor becomes a shower pan: a pre-slope, a waterproofing membrane with its matched drain, and a 24-hour flood test with the drain plugged and two inches of water — before a single tile. Walls get cement board and the same membrane, the curb is built and wrapped, and only then does the thinset and tile work start. Buy one system and follow its manual; the kitchen backsplash guide covers the tile-setting habits that carry over.

Step by step

  1. Plan the kit and pull the permit

    Measure the alcove (a standard tub space is 60×30 or 60×32 in) and buy a base and wall kit that fits it exactly, plus a matched rough-in valve and trim, a 2 in drain assembly for that base, and a door. Apply for the plumbing permit and confirm when the rough-in inspection happens. Turn off the water, drain the lines, and kill the bathroom circuits at the panel.

  2. Demolish the tub and surround

    Pull the door or curtain rod, the trim, the spout and handles. Cut the surround and the drywall behind it back to the studs with the multi-tool. Disconnect the drain from below or through the overflow, cut the old supply stubs, and free the tub's flange. A steel or acrylic tub lifts out with two people; a cast-iron tub is cut into pieces in place with a reciprocating saw or a grinder, with a blanket over it and a respirator on. Bag everything for the dump.

  3. Inspect and repair what's there

    Probe the subfloor at the drain and along the outside wall; cut out and replace anything soft with matching plywood, screwed to the joists. Check the studs for plumb and flat — shim or plane them, the panels will show every bow. Replace any galvanized supply pipe you can reach. Add blocking between studs where grab bars might go, now, whether or not you install them.

  4. Run the drain and set the valve

    Open the floor and reroute the drain to the base's center: 2 in PVC, a 2 in P-trap directly under the drain, sloped 1/4 in per foot to the branch, roughed 1/4 in above the subfloor. Mount the valve on blocking at 38–48 in, plaster guard flush with the finished wall plane, and connect the supplies with push-fit or crimped PEX. Add the shower arm drop-ear elbow at 72–78 in. Cap the valve, pressure-test the supplies, and call for the rough-in inspection.

  5. Set the base

    Dry-fit the base over the drain and check level both ways. Install the drain assembly on the base per its instructions — gasket, seal, tightening sequence. Spread a mortar bed where the base's ribs land, set the base, walk it level, and fasten the flange to the studs only where the manufacturer says. Leave it to cure overnight. Seal the drain body to the pipe with the specified solvent or gasket.

  6. Install the wall panels

    Dry-fit all panels and mark the valve and arm holes on the plumbing wall; cut them with a hole saw. Back wall first, then the side walls, each sealed to the base flange and to the next panel with 100% silicone, adhesive on the studs behind, screws or clips through the flange. Fit the valve trim and shower head. Then the corner trim or caps the kit provides.

  7. Hang the door and caulk

    Install the door frame plumb on the panel flanges per its instructions, with silicone under the sill, and hang the panels. Run a bead of silicone along the base-to-wall joint on the inside, every vertical panel joint, and around the door frame — tooled smooth, not smeared. Let it cure 24 hours before water touches it.

  8. Finish, test and close out

    Patch and paint the drywall around the alcove, reinstall the trim, turn the water on and test the valve's temperature limit stop. Run the shower for ten minutes and check the drain from below and every joint for weeping. Fit grab bars into the blocking if wanted. Call for the final inspection, and keep the permit with the house records.

What would this cost you? The walk-in shower calculator prices the DIY version with the tools you already own and a value on your time, next to a pro quote.

Frequently asked questions

Can I convert a tub to a walk-in shower myself?

With an acrylic base and wall kit, yes, if you're comfortable with basic plumbing: cutting out the old tub drain, running a new 2 in drain and trap to the center of the base, and installing a pressure-balance valve in the wall. Access from below (a basement or crawl space) makes it a weekend of plumbing; a slab or a finished ceiling below makes it harder and sometimes a plumber's job. Pull the permit; the rough-in inspection checks exactly the parts that fail.

How do you move a tub drain for a shower?

Open the floor at the old drain, cut the 1.5 in trap and arm out, and run a new 2 in line to where the shower base's drain lands — centered on a standard 60×32 base — with a 2 in P-trap directly under it and a slope of 1/4 in per foot back to the existing branch. Glue-up PVC, or a no-hub coupling to cast iron. Rough the drain 1/4 in above the subfloor so the base's drain body seats on it. This is the step to have inspected before the base goes in.

What kind of shower valve do I need?

A pressure-balance valve at minimum — required by code on every new shower to prevent scalding when a toilet flushes — or a thermostatic valve if you want a set temperature and a separate volume control. Buy the rough-in valve and the trim as a matched set from one manufacturer, set the valve at 38–48 in off the floor with the plaster guard flush to the finished wall, and plan an access panel behind it or use a valve serviced from the front.

How do you install an acrylic shower base?

Dry-fit it, mark the drain, and confirm it sits level; shim high spots on the subfloor. Then mix a bag of mortar or the manufacturer's setting compound, spread a bed where the base's support ribs land, seat the drain assembly with its gasket and seal, and set the base into the bed, walking it level in both directions. Fasten the flange to the studs with the screws or clips the manufacturer specifies — never through the flange where it isn't pre-drilled. Let it cure a day before the walls go on.

How are shower wall panels attached?

Direct-to-stud kits screw or clip through a flange at the top and sides, with panel adhesive on the studs behind; they need no drywall behind them but the studs must be flat and plumb (shim or plane them). Glue-up panels go over cement board or moisture-resistant drywall with adhesive. Cut the plumbing wall panel for the valve and shower arm with a hole saw, dry-fit all three walls, then set the back wall first and the side walls over it, sealing every joint with 100% silicone.

What's behind the tub when you take it out?

Usually 30 years of dust, and often more: a damp or rotten subfloor at the drain, a valve that's been weeping into the wall, mold on the studs, galvanized supply pipe, and framing that isn't plumb. Plan a day for repairs before the base goes in — a patch of subfloor, a stud sistered, a length of pipe replaced. Water-damaged framing that goes beyond a patch is where a DIY conversion becomes a contractor's remodel.

How long does a DIY tub-to-shower conversion take?

24–40 hours: a day for demolition and cleanup, a day for the drain and valve plumbing, a wait for the rough-in inspection, a day to set the base and let it cure, a day for the walls, door and caulk, and a day of silicone curing before the first shower. Three weekends is realistic; a pro crew does it in two to three days. A tile shower is 40–70 hours over five or six weekends, with the flood test and cure times inside that.

Sources

  1. Plumbers, Pipefitters, and Steamfitters (SOC 47-2152), Occupational Employment and Wage Statistics , U.S. Bureau of Labor Statistics, 2026-04
  2. How Much Does a Walk-In Shower Cost? , HomeGuide, 2026-09
  3. How Much Does a Walk-In Shower Cost? , Angi, 2026-09
  4. How Much Does a Tub-to-Shower Conversion Cost? , Angi, 2026-09
  5. How Much Does a Tub to Shower Conversion Cost? , HomeAdvisor, 2026-09
  6. TCNA Handbook for Ceramic, Glass, and Stone Tile Installation , Tile Council of North America, 2026-09
  7. International Residential Code, Chapter 27: Plumbing Fixtures (P2708 Showers) , International Code Council, 2026-09
  8. Shower kits, bases, valves, waterproofing and tile pricing , The Home Depot, 2026-09

Figures last reviewed . See how we estimate.