How to Pour a Concrete Slab: Forms, Base, Pour and Finish

Updated · See the full concrete slab installation cost comparison

Pouring a 20×20 slab yourself: $2,344–$2,718 in concrete, forms and rentals, 24–40 hours with three helpers.

  • Do a 10×10 or 12×12 at grade with a helper. Above about 200 sq ft — or anything a building or car sits on — the pour outruns two people and the code work starts.
  • The slab is only as good as what's under it: 4 inches of compacted gravel on undisturbed soil, forms set with a 1/8 in per foot fall away from the house.
  • Have the forms, base, mesh, tools and helpers ready before the concrete arrives. From the first bag or the truck's first chute you have about 90 minutes.
  • Screed, wait for the bleed water to go, then float, edge, cut joints and broom. Cover and keep it damp for a week; stay off it for three days.

Before you start

Read the cost comparison first. A 10×10 or 12×12 at grade is a fair DIY job that saves about $100 and teaches you the trade; a 20×20 saves about $1,000 but needs a crew of three or four and a rented skid steer for the excavation. This guide is written for the small slab. The steps are the same for a large one — it’s the pace that changes.

Two conditions before you commit: nothing will be built on the slab that needs a permit and an inspection, and a mixer or a ready-mix truck can get to it. If either isn’t true, get quotes.

What you need

For a 10×10, 4 inches thick: about 60 bags of 80 lb mix or a 1.5-yard short load of ready-mix, 1.25 yards of 3/4-inch crushed stone, four straight 2×4s plus stakes and screws, a sheet of welded wire mesh with chairs, an expansion-joint strip if it meets a wall, and plastic sheeting or curing compound.

Tools: a rented mixer for bagged mix, a hand tamper, a bull float with handles, a hand float, an edger, a groover, a steel trowel, a straight 2×4 for screeding, a 4-foot level, mason’s line and a line level — plus rubber boots, gloves and glasses, because wet concrete burns skin. The priced list is on the cost page.

The two things that decide how it turns out

The base. A slab cracks and settles because of what’s under it, not what’s in it. Dig to firm ground, compact the gravel in thin lifts, and keep the slab a uniform 4 inches. Every shortcut here shows up as a crack in a year.

The clock. Once concrete is mixed you have about 90 minutes to place, screed and float it, then a waiting period, then a short window to edge, joint and broom before it’s too hard. Everything else in this job can be done slowly and checked twice. Do the slow parts perfectly so the fast part is just execution.

Step by step

  1. Check rules and mark the layout

    Call the building department about permits and setbacks, and call 811 to have utilities marked (free, takes a few days). Drive stakes at the corners, run mason's line, and square it by checking that the diagonals match. Set the finished slab height so it sits 1–2 inches above grade and slopes away from any building at 1/8 inch per foot — mark that height on the stakes with a line level.

  2. Excavate

    Dig the whole footprint plus a foot outside it to 8 inches below the finished height: 4 inches for the slab, 4 for the base. Remove roots, topsoil and anything soft; the slab needs undisturbed or well-compacted ground. A 10×10 is about 2.5 cubic yards of soil, most of which can be spread on site. Keep the bottom flat — high spots thin the slab, low spots waste concrete.

  3. Build and set the forms

    Frame the perimeter with straight 2×4s, screwed at the corners, top edges at the finished-height line. Drive stakes every 2–3 feet on the outside and screw the forms to them, checking level along each side and the fall across the slab with a 4-foot level. Sight down each board for bows. Brush the inside faces with form-release oil or vegetable oil. Where a wall or existing slab meets the pour, nail an expansion-joint strip to it.

  4. Lay and compact the base

    Spread 3/4-inch crushed stone in two 2-inch lifts, compacting each with a hand tamper (small pad) or plate compactor. The finished base should be 4 inches below the top of the forms everywhere — check with a straightedge across the forms and a tape. Dampen it before the pour so it doesn't suck water out of the concrete.

  5. Add vapor barrier and reinforcement

    For a slab that will be enclosed, roll out 10-mil poly over the base, lapped 6 inches and taped. Lay welded wire mesh or tie a rebar grid, stopping 2 inches short of the forms, and set it on chairs so it sits in the middle of the slab. Steel lying on the base does nothing. Don't plan to hook it up during the pour — that's how it ends up on the bottom.

  6. Order or mix the concrete

    Measure length × width × average depth in feet, divide by 27 for cubic yards, and add 10%. Ask for 3,500–4,000 psi, air-entrained where it freezes, and a 4–5 inch slump; tell the plant it's a homeowner pour so they can set a realistic unload time. For bagged mix, rent a mixer, stage the bags and a hose at the forms, and mix to a stiff, workable consistency — no extra water. Have everyone and every tool at the forms before the truck arrives.

  7. Pour and screed

    Place the concrete starting at the far corner, raking it into the corners and slightly above the forms, and work toward the truck. Screed as you go: two people draw a straight 2×4 across the form tops with a sawing motion, filling low spots ahead of it, then pass again. Tap the forms with a hammer to release air along the edges.

  8. Float, edge, joint and finish

    Run the bull float right after screeding to push down aggregate and bring up paste — three or four passes, each barely overlapping. Then wait: bleed water rises and must evaporate before you touch the surface again (20 minutes to 2 hours depending on weather). When a thumb leaves a 1/4-inch print, run the edger along the forms, cut control joints with a groover every 8–10 feet, hand-float any rough areas, and finish with a broom drawn in one direction for a non-slip texture.

  9. Cure and strip

    Cover with plastic or spray curing compound as soon as the surface won't mar, and keep it damp for 7 days. Strip the forms after 24–48 hours and backfill the edges. Foot traffic at 2 days, a shed at 3, vehicles at 7, full strength at 28. If you missed the joints while finishing, saw-cut them within 18 hours.

What would this cost you? The concrete slab installation calculator prices the DIY version with the tools you already own and a value on your time, next to a pro quote.

Frequently asked questions

How many bags of concrete do I need for a 10×10 slab?

About 56 bags of 80 lb mix for 4 inches thick, and 60 or so once you allow for uneven excavation — each 80 lb bag yields 0.6 cubic feet, and a 10×10×4 slab is 33.3 cubic feet (1.23 cubic yards). For 60 lb bags, about 75. That's roughly $400 at $6.50–$7 a bag and a full day with a rented mixer. A 12×12 is about 1.8 yards or 80 bags, which is where a ready-mix short load starts to make more sense.

Should I use bagged concrete or ready-mix for a slab?

Bagged mix up to about 1.5 cubic yards (a 10×10 or a bit larger) if you rent a mixer and have a helper feeding it; ready-mix for anything bigger. Ready-mix is $170–$220 a yard plus a short-load fee of $60–$150 under 4–6 yards, so a 2-yard order lands around $500–$600 — close to bagged cost with none of the mixing. The trade-off is timing: bagged mix lets you pour in sections at your pace; a truck gives you 90 minutes for the whole slab.

Does a concrete slab need rebar or wire mesh?

It needs one of them. 6×6 welded wire mesh, held at mid-depth on chairs, is enough for a patio, walkway or shed pad. Use #3 or #4 rebar on 12–18 inch centers for a garage, workshop, driveway or anything on clay or fill. Steel doesn't stop concrete from cracking — control joints do that — it holds the cracks tight and keeps the pieces level. Fiber added to the mix reduces surface crazing but isn't a substitute.

How thick should a concrete slab be?

4 inches for patios, walkways, shed and hot-tub pads. 5 inches for a driveway or single-car garage. 6 inches for anything that carries trucks, RVs, a lift or equipment. A slab that a building sits on also gets a thickened edge — typically 8–12 inches deep and 12 inches wide around the perimeter — or a separate footing below frost depth in cold climates, which the building department will specify.

Can one person pour a concrete slab?

A small pad with bagged mix, yes — mixing and placing a few bags at a time keeps it manageable. A ready-mix pour, no: one person can't rake, screed and float five yards before it stiffens. For anything from a truck plan on three people for a 12×12 and four for a 20×20, at least one of whom has finished concrete before. The pour is the one step you can't pause or redo.

How long before you can walk or drive on a new concrete slab?

Foot traffic after 24–48 hours, light loads and a shed after 3 days, cars after 7 days, and full design strength at 28 days. Keep it damp and covered for the first week — misting under plastic or curing compound — because concrete that dries out early is weaker and dusts. Don't let it freeze in the first few days.

How do I keep a concrete slab from cracking?

Compact the base, keep the slab a uniform thickness, don't add water on site to make it easier to work, and cut control joints at the right spacing and time. Joints go every 8–12 feet for a 4-inch slab (about 2–3 times the thickness in inches, in feet), at least a quarter of the slab depth, tooled while finishing or saw-cut within 6–18 hours. The slab will still crack — the joints decide where.

Sources

  1. Cement Masons and Concrete Finishers (SOC 47-2051), Occupational Employment and Wage Statistics , U.S. Bureau of Labor Statistics, 2026-04
  2. How Much Does a Concrete Slab Cost? , HomeGuide, 2026-09
  3. How Much Does a New Concrete Slab Cost? , Angi, 2026-09
  4. How Much Does a Concrete Slab Cost? , HomeAdvisor, 2026-09
  5. Concrete Volume Calculator , Quikrete, 2026-09
  6. International Residential Code, Chapter 5: Floors (R506, Concrete Floors on Ground) , International Code Council, 2026-09
  7. Concrete mix, rebar, mesh and form lumber pricing , The Home Depot, 2026-09

Figures last reviewed . See how we estimate.